Deck building basics: permits, footings, ledger and safety

A deck looks simple, but deck failures can injure people. Most of the risk sits in the footings, the ledger connection to the house, and the railings.

  1. Check permits and setbacks

    Many jurisdictions require a permit for attached decks, decks above a certain height, or decks over a certain size. Ask, and ask whether they publish a prescriptive deck guide.

  2. Locate utilities

    Call 811 (in the US) before you dig, every time.

  3. Design to code

    Joist size and spacing, beam spans and footing size depend on loads, wood species and local code. Use your local prescriptive guide or have it designed.

  4. Footings

    Footings must be the size and depth your code requires (often below frost depth). Inspection is usually required before concrete.

  5. Ledger attachment

    An attached deck's ledger must be fastened to the house framing with code-approved bolts or screws, never nails alone, and flashed so water cannot get behind it. A rotted or poorly attached ledger is a well-known cause of collapses.

  6. Framing and hardware

    Use rated, corrosion-resistant connectors and fasteners compatible with treated lumber.

  7. Decking, railings and stairs

    Guard height, baluster spacing, stair rise and run, and stair lighting have code requirements. Follow them exactly.

  8. Final inspection

    Then inspect it yourself every year: loose connections, rot, and rusted hardware.

Safety: If your deck is high off the ground, attached to a house with unknown framing, or will carry a hot tub, get an engineer or licensed contractor involved.

Next step

Plan your weekends so the deck gets done.

Weekly CEO Planner: A 15-minute weekly routine for priorities, numbers and follow-ups. Printable PDF (Letter + A4).

Get it for $9 Our own product, sold on Gumroad. Instant download.

Related: Kitchen remodel steps in the right order · Bathroom remodel steps: the sequence that prevents leaks · Owner-builder new home: the phases from land to final inspection · Remodel budget calculator

LAUNCH40 · 40% offFree budget calculator