Bathroom remodel steps: the sequence that prevents leaks

Water is the enemy in a bathroom. The steps that matter most are the ones you cannot see after the tile goes on.

AI-generated image: dated bathroom before remodelAI-generated image: remodeled bathroomBeforeAfter
AI-generated images, not a real project. Drag to compare a dated bathroom with a finished remodel.
  1. Plan and permit

    Moving a toilet, shower or vanity drain, adding circuits or changing the fan usually needs permits. Ask first.

  2. Demolition

    Shut off water, protect the drain openings, and check for rot under the toilet and tub. Test older materials for asbestos and lead first.

  3. Fix the floor and framing

    Repair soft subfloor and damaged framing before anything else. Tile needs a stiff, flat base; the tile maker publishes deflection and flatness requirements.

  4. Plumbing and electrical rough-in

    Licensed trades where required. Bathrooms need GFCI-protected outlets and a properly vented exhaust fan ducted outside, not into the attic.

  5. Rough inspection

    Before walls close.

  6. Backer board and waterproofing

    Use cement board or a foam board system rated for wet areas, then a waterproofing membrane per the manufacturer. Many systems require a flood test of the shower pan before tiling.

  7. Tile

    Floor and walls, then grout and seal as the product requires.

  8. Drywall and paint outside the wet zone

    Moisture-resistant products and a bath-rated paint.

  9. Vanity, toilet, fixtures, trim

    Set the toilet with a new wax or foam ring, and caulk changes of plane in tile with the right sealant.

  10. Final inspection

    Then run the fan during and after every shower.

Safety: Mixing electricity and water is dangerous. Turn off the circuit at the panel and verify it is dead with a tester before touching any wiring, and leave new circuits to a licensed electrician where required.

Next step

Write down your process so every step happens in order.

SOP Template Kit: Editable standard operating procedures (Word + PDF) so work gets done the same way every time.

Get it for $19 Our own product, sold on Gumroad. Instant download.

Related: How to plan a remodel: budget, scope, permits, and DIY vs. hiring · Kitchen remodel steps in the right order · Remodel budget calculator

LAUNCH40 · 40% offFree budget calculator