Project phase checklist
Tick items as you go. Progress saves in this browser only. Print it for the job site.
0% complete
1. Plan
- Scope written room by room
- Building department called; permits listed
- Budget with contingency done
- Bids collected and contractors verified (license, insurance)
- Written contracts signed
2. Prep
- Permits issued and posted
- Lead/asbestos testing done if needed
- Utilities located (811) for any digging
- Temporary kitchen/bath and dust protection set up
3. Demo & structure
- Utilities shut off and capped by qualified people
- Demolition complete
- Structural work done (engineered if required)
4. Rough-in
- Plumbing rough-in (licensed where required)
- Electrical rough-in (licensed where required)
- HVAC/gas rough-in (licensed where required)
- Rough inspections passed before closing walls
5. Close-up
- Insulation (inspected if required)
- Drywall hung and finished
- Prime and paint
6. Finish
- Flooring
- Cabinets, counters, tile
- Fixtures and appliances connected
- Trim and hardware
7. Close-out
- Final inspections passed
- Punch list complete
- Lien waivers and warranties filed
- Final payment made
Next step
Plan each week of the project in 15 minutes.
Weekly CEO Planner: A 15-minute weekly routine for priorities, numbers and follow-ups. Printable PDF (Letter + A4).
Get it for $9 Our own product, sold on Gumroad. Instant download.